Define what the quoted amount covers

A transit-document fee and a complete shipment price answer different questions. Before comparing totals, describe the route, cargo, number of consignments, transport mode and requested operations. Ask for the scope in writing.

This guide explains how to request and compare an estimate. It does not publish Eresan tariffs or calculate customs duties, and no example amount is presented as an available offer.

Separate the operations in the estimate

  • Document preparation: which document sets and tasks are included?
  • Guarantee-related work: who provides the arrangement, under which procedure and on what basis?
  • Transport: which road, ferry or container legs are included?
  • Third-party charges: identify port, terminal or other operations where applicable.
  • Changes and additional work: ask what triggers a revised estimate.

A declaration and a guarantee are different components of transit. The applicable system and participants must be identified for the actual movement; a commercial preparation fee should not be confused with the underlying customs obligation.

Explain what makes the file simple or complex

Describe the number of parties and invoices, item details, cargo characteristics and current document readiness. A single complete set and several sets awaiting corrections require different preparation. State what is confirmed and what is provisional.

For LTL cargo, provide the consignment register as well as the truck summary. For a Ro-Ro movement, identify the transport unit and intended route. Do not compare a road-only estimate with one that includes a sea leg as if the scope were identical.

Use a written comparison checklist

  • Coverage: same loading point, destination, mode and operations?
  • Documents: same parties, item details and number of sets?
  • Charges: which items are included, excluded or payable to another party?
  • Commercial basis: currency, tax treatment, payment terms and validity stated?
  • Changes: who confirms extra work and how is the revised amount approved?

A lower headline amount may simply omit part of the work. Compare the written inclusions before deciding which estimate matches your shipment. Ask for clarification where an item is unspecified.

Keep an estimate current when the shipment changes

Tell the provider about a new consignee, additional packages, changed vehicle, port or delivery point. Ask whether the change affects document work, transport or third-party operations. Keep the revised scope alongside the current document set.

Do not assume that a previous shipment’s amount remains valid for a different movement. Likewise, a planned completion time depends on document readiness and participants’ actions; it is not a promise of a fixed border-crossing time.

Send a request that can be assessed

Include the route, cargo description, package and weight data, parties, intended departure and available documents. Specify the operation you need and list unresolved details. Ask for an itemised scope, exclusions and the next information required.

Use the transit service for the overall customs preparation, the LTL page for consolidated cargo, or the Samsun–Novorossiysk page for a freight ferry movement. These are the existing service directions; the guides help you prepare a clearer enquiry.

Continue planning your shipment

Official references